During the summer we have done further improvements to our truck.
We started by installing a small window in the bathroom
Afterwards we built the frame where the toilet will be installed:
we ensured that the shower base fitted:
and we built the toilet and its cover:
And the bathroom was finally ready… except for the door:
In total, it took approximately 70 hours to complete all work in the bathroom.
We have decided against a bathroom door for the time being. At present, we have just fixed a shower curtain, as we are still unsure what the best door is (folding door, sliding door, etc.).
If you want to see how it all started, read this post and watch the video.
Leave a Reply